Principle: INPEX

Engineered in The Netherlands & constructed in South Korea between 2015 - 2017

The mega LNG project is owned by the operator and major Japanese gas producer INPEX and Total. Daewoo Shipbuilding and Marine Engineering (DSME) won the contract for building the floating production, storage, and offloading facility called the Ichthys Venturer. Veolia MPP Systems specialises in the development, supply, and maintenance of water purification units using the advanced Macro Porous Polymer Extraction (MPPE) process, which removes hydrocarbons from water. The Ichthys Venturer was equipped with an MPPE purification unit.

  • EEHA and Verification Dossier Engineering Works
  • Procurement, ITP’s and FAT’s
  • Construction Crew Gland Training and Gland Management
  • Construction Supervision
  • A team of 5 inspectors  completed initial detailed inspections